Livestock buildings in South Wales
Cattle sheds and sheep sheds for Welsh farms, designed and erected by South West Steel Buildings. The frame is the easy part. What this page covers is the rest: the store the Welsh slurry regulations make you build beside it, the grants that pay for roofs and stores but not for housing, the planning rule that catches livestock buildings and no others, and the two consents with their fees.
- Slurry store
- 5 months
- The minimum for cattle under the Welsh regulations, 6 for pigs and poultry. It sets the size of what sits beside the shed.
- Grant for the shed
- None open
- Roofs over feeding and gathering areas beside it: £40 a m². The housing itself is not funded.
- Planning trap
- 400 m
- Livestock housing within that distance of someone else’s dwelling loses permitted development.
- Two consents
- £223 + £420
- Prior notification, then drainage approval for anything over 100 m². The SAB has 7 weeks.

What you are actually buying
A portal frame, open to the weather on one side and closed to it on the other, laid out so one person can feed, bed and scrape without fighting the building. The steel is the part everyone gets right. Where the air enters, where the effluent goes and how big the store beside it must be are where Welsh sheds succeed or fail.
Width comes from the pens
Set out the pens, the feed passage and the scrape line first and let the span follow. A passage the loader cannot get down without catching the barriers is a mistake you meet twice a day for thirty years.
Length is how many head
Six metre bays divide into pens and feed barriers without waste. Put the spare bay in now if there is any chance you will want it: adding one later means groundworks, steel and the planning question all over again.
Height moves the air
The gap between eaves and ridge drives the draught that carries damp air out. Too low and it stagnates, too tight and it condenses onto the stock. It also has to clear the loader on muck-out day.
What you get asked to decide
- Space boarding, Yorkshire boarding or sheeted sides, with an open or capped ridge
- Feed barriers, gates and pen divisions, and which end the passage runs from
- Channels, drains and the route for dirty water, decided before the first dig
- Cladding carried down to a concrete panel, so it is the panel a bullock leans on
- Supplied for your own people to put up, or supplied and erected
There is one more choice underneath all of those: whether the frame is cold rolled or hot rolled. It changes the price, the lead time, whether you can put it up yourself, and what goes in the ground.
How it goes from here
Five steps, in this order. The fourth is the one nobody prices for you up front, which is why there is a calculator further down this page.
Step 1
Tell us roughly what you need
Span, length and what it is for. Approximate is fine — nobody expects you to have decided, and it means the first reply can be useful rather than a list of questions.
Step 2
Drawings and a price for the frame
The manufacturer prepares engineered drawings and quotes the building. That includes the pad foundation sizes, which no calculator can work out for you.
Step 3
Settle the planning position
Prior approval on a qualifying agricultural holding, or a full application. Worth establishing before steel is ordered rather than after.
Step 4
Get the base in
Site strip, level, stone and slab, ready and cured before the erectors arrive. This is the part you can price on this page today.
Step 5
Delivery and erection
Delivered for your own team to put up, or supplied and erected. Both are normal; the difference is worth asking about at quote stage, not later.
Rough dimensions are enough to start. You get a reply the same day.
Sheds for a country that grazes
Over 90% of Wales is farmed, and almost all of it is grazed: 8.8 million sheep and lambs and 1.08 million cattle and calves at the June 2025 count. The Welsh Government's own survey puts the reason plainly: "Most of Wales is hilly or mountainous and this, combined with relatively poor soil quality and a wet climate, means that much of the land is restricted to the grazing of sheep and cattle."
That shapes the buildings. A sheep flock wants a lambing shed that stays dry and can be penned up and taken down each spring. A suckler herd or a dairy herd wants housing that holds cattle through a long wet winter, with the feed passage, the scrape route and the store to match. The beef herd is shrinking (-5% in a year) and the dairy herd is growing (+1.1%), and a growing dairy herd means more cattle housed for longer and a store that has to keep pace with the shed.
Exposure is the other Welsh variable. A hill site or a coastal one takes wind and driven rain that a sheltered yard never sees. The frame is designed for the wind the site gets, the open side faces away from the weather, and the boarding gap is chosen for that wind, not copied from a shed in a valley. None of that costs much at the design stage. All of it costs a great deal once the sheets are on.
The store is sized by the rules, and by your roof
In Wales the Water Resources (Control of Agricultural Pollution) (Wales) Regulations 2021 (WSI 2021/77) apply to every farm, not only to the old nitrate vulnerable zones, and Natural Resources Wales enforces them. Three parts of them decide what you build beside the shed.
- 5 months. A slurry store for cattle has to hold that much; 6 months for pigs and poultry. Stores that already existed have had to meet it since 1 August 2024.
- Built to the standard. A new store or silo goes up to the construction standards in the regulations: impermeable base and walls, effluent collection to the set capacity. A store from before 1991 can be exempt from the construction standard but never from the capacity rule, and never if Natural Resources Wales decides it is a pollution risk.
- 14 days' notice. Before building, enlarging or rebuilding a store you tell Natural Resources Wales in writing what it is and where it is, at least that long before work starts. A notice, not a permit, and not optional.
Now the roof. Every square metre of it sheds rain, and Wales has plenty. If that water goes into the channels it becomes slurry, and the store you must build for 5 months grows to hold it. If it goes down a gutter to a clean drain or a rainwater tank, it costs a downpipe. That is the single cheapest decision on the whole job, and it has to be made before the concrete is poured, because falls and channels are not something you move afterwards.
A summary, checked on 23 September 2026, not legal advice. The Welsh Government guidance for farmers and Natural Resources Wales's page on storage are the texts; Natural Resources Wales gives preliminary advice if you ask.
What the grants pay for, and what they do not
No Welsh Government scheme that has been published funds the construction of livestock housing. The scheme that is open, SFS Optional: Small Infrastructure, pays £40 a square metre towards a new roof over a feeding area, a gathering area or a manure store that has no roof now, and the roofed area must not become housing afterwards. The larger SFS Optional: Infrastructure and Equipment category has been announced for slurry stores, covered manure stores, silage clamps, yard roofs and livestock isolation facilities, but had not opened when this page was last checked, and the scheme it replaces listed new housing as ineligible.
Shed first, grant second
Plan the housing on its own merits. Then look at what stands beside it — the covered collecting yard, the muck store, the clamp, the isolation pen — because that is where the money is, and those are steel-framed jobs too.
The farm grants guide has every scheme with its status, and the yard roofing calculator checks a yard against the open one.
The 400 metre rule, then the two consents
Housing livestock is the one thing that strips a farm building of permitted development on its own. Within 400 metres of a dwelling that is not on your unit, a livestock building or a slurry store needs a full planning application, whatever else it satisfies. Walk it with a wheel before you draw anything.
Outside that distance, and on a holding of the right size, the route is a prior notification: £223, and the council has 28 days to say whether it wants to approve the siting and design. Either way, a shed and its yard are far more than 100 m² of construction, so the drainage goes to the council's SuDS Approval Body as well: a shed on a tight site plan is £420, and the SAB has 7 weeks to decide, with silence counting as a refusal. Put both in together. The planning guide has the size tests and every fee.
In Wales, farm buildings get their permitted development rights from Part 6 of the 1995 General Permitted Development Order, which splits at 5 hectares — and the two halves are not the same right with different numbers on them.
On a unit of 5 hectares or more, Class A permits a new building, or the extension or alteration of one, if it is reasonably necessary for agriculture on that unit. Its ground area cannot exceed 465 square metres — counted together with anything else put up on the unit within 90 metres in the previous 2 years. It must be no more than 12 metres high and at least 25 metres from a trunk or classified road. England's limits are far larger; they do not apply here.
On a unit of 0.4 to under 5 hectares, Class B does not let you put up a new building at all. It permits a limited extension or alteration of a farm building you already have — no taller, no more than 10 per cent more volume, and no more than 465 square metres in all. With four hectares and nothing to extend, a new shed is a full planning application.
Where Class A applies, you are not applying for planning permission. You notify the council, which has 28 days to decide whether it wants to approve the siting, design and external appearance. You can start when it says it does not, when it approves them, or when 28 days pass without a reply — provided the building genuinely is permitted development in the first place.
For livestock the exclusion that bites hardest is the one above: no livestock building, and no slurry or sewage sludge store, within 400 metres of the curtilage of a protected building, except in the limited cases the Order allows.
Two more things are Welsh. Construction of 100 square metres or more needs its drainage approved by the SuDS Approval Body even when it is permitted development. And in a National Park the park authority is the planning authority — here, the Bannau Brycheiniog National Park Authority or the Pembrokeshire Coast National Park Authority.
A summary, not planning advice. The legislation is SI 1995/418, Schedule 2, Part 6 as in force in Wales, checked against legislation.gov.uk on 23 September 2026. The full rules are on our planning guide for farm buildings in Wales. Confirm your own position with the authority that covers your site.
Floors: falls, then chemistry
A machinery store can have a flat floor. A cattle shed cannot, because what the stock produce has to travel: to a channel, along it, into the store. The slab for the housed area is usually thinner than a machinery store's, 175 mm with mesh as a starting point, because cattle spread their weight where a turning trailer concentrates it. The money you save on thickness goes on falls, channels, kerbs and the collection end, and on a mix that can take what stands on it.
That last point is chemistry. Slurry and silage effluent are acidic, and ordinary concrete is attacked by them rather than merely stained; a floor specified like a garage floor frets and exposes its aggregate years early. Ask your ready-mix supplier for a mix for agricultural effluent exposure and tell them what it will hold. The premium at the order is small next to the cost of relaying it.
What the calculator leaves out
It prices the slab, the stone under it and the earthworks. It does not size the channels, the effluent tank or the slurry store, and it does not size the pad foundations, which a structural engineer designs against your span, eaves height, the wind on your site and what the ground will bear. Those arrive with the drawings when you ask for a price. Treat the figures below as the floor and the ground, and price containment separately.
Work out the base for your livestock building
Preset to a livestock floor. Put in your own span and length and say what the ground is like, and it gives you the concrete, the stone and the muck-away before channels, kerbs and aprons.
What this does not work out: the pad foundations
The concrete pads the stanchions sit on are sized by a structural engineer, not by a formula. They change with the span, the eaves height, the wind loading on your particular site and what the ground will bear. Anyone quoting you a pad size without a design has guessed it.
Want this priced properly?
Send us the job and we'll get you engineered drawings and a quote for the frame — with the pad sizes this tool can't work out. The figures above go with your enquiry, so you don't have to type them again.
Every enquiry gets a reply the same day, and your figures go with it. The building itself is designed and priced by South West Steel Buildings, our building partner, so your details go to them too, and they will be in touch. How we handle your details.
Common questions
- How wide should a cattle shed be in Wales?
- Draw the inside first. Pens along one side or both, a feed passage a loader can drive down without clipping the barriers, and the line you will scrape every day. Add the gap you need to pass a parked feeder and the span is whatever that comes to. Welsh sheds tend to end up between 12 and 24 metres because that is what two rows of cattle and a passage need, not because those are pretty numbers. A passage that is half a metre short is a daily irritation for as long as the building stands, and the steel cannot be pushed out later.
- How do you ventilate a shed on an exposed Welsh site?
- Carefully, because the same hillside that gives you free air movement in October will drive rain through the boarding in January. Air comes in low through space boarding or Yorkshire boarding and leaves through an open or capped ridge; the height difference between the two does the work. On a site that takes the weather, the open side faces away from it, the boarding gap is chosen for the wind the site actually gets, and the engineer designs the frame for that exposure rather than for a sheltered lowland yard. Tell the designer where the shed sits and what it faces before the boarding is chosen.
- Does a lambing shed need the same floor as a cattle shed?
- No. A lambing shed is usually bedded on straw over a floor that stays dry, with individual pens that come and go, and it does not produce slurry in the way housed cattle do. Falls still matter so washings leave the building, but the channels, kerbs and collection end that a cattle shed needs are not the same job. The frame is the same kind of frame; what changes is the concrete under it and the store beside it, so say which stock is going in before either is specified.
- Is there a grant for a new livestock shed in Wales?
- Not one that has been published. Small Infrastructure pays for a roof over an area already in use, not a new building, and the roofed area must not become housing. Infrastructure and Equipment is described as similar to the Nutrient Management Investment Scheme, which listed the construction of livestock housing as ineligible in every window; whether that carries over will only be known when its guidance is published. Plan a new shed on its own merits, and treat any grant as a bonus for the yard, store or clamp beside it.
- What is the 400 metre rule?
- Part 6 permitted development is withdrawn for a building that houses livestock, and for slurry or sludge storage, when it would be within 400 metres of the curtilage of a protected building, which broadly means a dwelling that is not part of your agricultural unit. Inside that distance you need a full planning application no matter how well the size and siting tests are met. Measure it before anything else, because it decides the route, the fee and the timescale of the whole job.
- What are the rules on slurry storage in Wales?
- The Water Resources (Control of Agricultural Pollution) (Wales) Regulations 2021. A slurry store must hold 5 months of slurry from cattle and most livestock, or 6 months from pigs and poultry, and it has to be built to the construction standards in the Regulations. Before you start building a new store — or substantially enlarging or rebuilding one — you must give Natural Resources Wales written notice of the type of store and where it is, at least 14 days before work begins. Rain that falls on a roof and stays clean does not have to be stored, which is why the roof and the drains matter as much as the tank.
- What do the prior notification and SAB application cost in Wales?
- The prior notification for an agricultural building is £223 from 1 December 2025. It is on the Welsh Government's full cost recovery pathway, so it stays at £223 through 2026 and rises from 1 April 2027: the published policy allows up to 10% or £100 a year, whichever is greater, plus inflation, until the fee covers the council's cost. The SAB application is £350 plus a charge on the construction area shown on your site plan: £70 for every 0.1 hectare or part of one up to half a hectare, less per tenth beyond that, capped at £7,500. A shed on a plan of under 0.1 hectare is £420. If approval is conditional on inspections, each one is £168. The SAB has 7 weeks to decide, 12 with an Environmental Impact Assessment, and an application not decided in time counts as refused.
- Do I need planning permission for a farm building in Wales?
- It depends first on the size of the holding. On an agricultural unit of 5 hectares or more, Class A of Part 6 of the Town and Country Planning (General Permitted Development) Order 1995 permits a building reasonably necessary for agriculture on that unit, up to 465 square metres — counted together with anything else put up on the unit within 90 metres in the previous 2 years. It must be no more than 12 metres high (3 metres within 3 km of an aerodrome), at least 25 metres from a trunk or classified road, and a livestock building or slurry store must be at least 400 metres from a protected building. Before building you notify the council, which has 28 days to say whether it wants to approve the siting and design. On a unit of 0.4 to under 5 hectares Class B allows only a limited extension or alteration of an existing building, and a new building needs full planning permission; under 0.4 hectares there are no agricultural permitted development rights at all. England's larger limits do not apply in Wales.
- Does a farm building in Wales need SAB approval?
- If it covers 100 square metres or more and affects how rain soaks into the ground, yes — even when it is permitted development and needs no planning application. Since January 2019 construction of that size in Wales needs approval of its surface water drainage from the SuDS Approval Body, which is run by your local council, before work starts. Farm roofs and clean yards are included, and the rainwater off a new roof is usually the whole question.
- Can I convert a farm building to a house in Wales without planning permission?
- No. England has a permitted development right, Class Q, that lets some agricultural buildings become homes through a prior approval application. Wales has no equivalent: a barn conversion in Wales needs full planning permission from the local planning authority. Much of what is written about barn conversions online is about England, so check which country it was written for before relying on it.
Livestock figures from the Survey of Agriculture and Horticulture, June 2025, Welsh Government.
Other buildings we cover
Same approach on each: what the building is, how it gets sized, where you stand on planning, and what the base underneath it comes to.
Machinery stores
A dry, clear-span shed for the tractor, the quad, the feed and the fertiliser, on a floor that takes a turning trailer. Priced above the ground and below it.
Grain stores
Retaining walls designed for the depth of grain, a slab for the loader, and a roof that does not drip on the heap.
Farm workshops
Space to mend a machine with room all round it, height for a hoist, and a floor built for axle stands. Plus the planning line between your kit and a repair business.
Hay barns
Bale storage for a wet summer: where to site it, what the fire services say about stacking, and the planning condition that follows a store near a house.
General purpose buildings
Bales one year, ewes the next, the tractor every winter. How to size and floor a shed whose job keeps changing, and the rules that change with it.
Stables and arenas
Stable blocks and arena buildings in Wales: a full planning application, a welfare code that sets the doors and headroom, and no farm grant.
Garages and workshops
Steel garages and workshops at the house or for a trade. The Welsh garden rules a steel frame meets first, and what an application costs when it misses one.
Industrial units
Warehouses, trade units and workshops in Wales: the use classes Wales kept, the fees and drainage approval, the rates bill and the finance.
Get a price for a shed that suits the site
Tell South West Steel Buildings the stock, a rough span and length, and where the shed sits. You get engineered drawings, pad sizes and a price for the building — and you already know what the floor under it costs.