Steel garages and workshops at the house or for a trade in Wales, designed and erected by South West Steel Buildings. Wales has its own rules for buildings in a garden, and a steel frame meets their height limit faster than a timber one does. This page sets out those rules, what changes in a National Park, and what an application costs when a building needs one.
- Eaves at the house
- 2.5 m
- The Welsh garden-building limit, at every point along the eaves. Above it, an application.
- If it misses a limit
- £283
- The householder application in Wales for a garage or workshop for the house itself.
- Run a trade from it
- £1,170
- The fee for a 9 × 12 m business workshop: a different application from a garage.
- Building Regulations
- 30 m²
- Detached, single storey, nobody sleeping in it: exempt up to this, subject to the conditions below.

What you are actually buying
A small clear-span frame, usually one or two bays, at the house or on a yard. The structure is simple. What takes the thought is which set of rules it sits under: the Welsh garden-building limits if it serves the house, a full application if a business works from it, and a much tighter limit anywhere in a National Park or an AONB.
Start from the door
What has to drive or wheel in sets the door, the door sets the eaves, and in a garden the eaves are capped at 2.5 metres. A car, a workshop bench and storage fit under that. A motorhome, a horsebox or a lift does not, and that turns the job into an application.
Leave room to work
Two cars side by side is roughly six metres clear. A bench and racking along one wall pushes it towards eight. A garage you cannot open a car door in is a store with a big door, so draw the inside before the outside.
House or trade decides the route
A building for the house that misses a garden limit is a householder application. One a business runs from is charged by floor area, and over 100 square metres its drainage needs the council’s SuDS Approval Body too.
What you get asked to decide
- Roller shutter, sectional or sliding doors, and a personnel door in the side
- Insulated composite panels if it will be worked in through the winter
- A pitched roof rather than a flat one, which the Welsh rules cap lower
- Roof lights, and the power and lighting runs agreed before the sheets go on
- Supplied for your own team to erect, or supplied and erected
There is one more choice underneath all of those: whether the frame is cold rolled or hot rolled. It changes the price, the lead time, whether you can put it up yourself, and what goes in the ground.
How it goes from here
Five steps, in this order. The fourth is the one nobody prices for you up front, which is why there is a calculator further down this page.
Step 1
Tell us roughly what you need
Span, length and what it is for. Approximate is fine — nobody expects you to have decided, and it means the first reply can be useful rather than a list of questions.
Step 2
Drawings and a price for the frame
The manufacturer prepares engineered drawings and quotes the building. That includes the pad foundation sizes, which no calculator can work out for you.
Step 3
Settle the planning position
At a house in Wales this runs on the garden-building rules in Part 1 Class E, not the farm route: check the limits on this page, the eaves first. Inside them there is nothing to apply for. Outside them, or if a business will use it, it is an application, and the fee depends on which.
Step 4
Get the base in
Site strip, level, stone and slab, ready and cured before the erectors arrive. This is the part you can price on this page today.
Step 5
Delivery and erection
Delivered for your own team to put up, or supplied and erected. Both are normal; the difference is worth asking about at quote stage, not later.
Rough dimensions are enough to start. You get a reply the same day.
Wales wrote its own garden rules
Most of what you read online about garden buildings describes England. Wales replaced its householder rules in 2013, and the version in force here has limits England does not state, three of which catch a steel garage.
- A flat roof stops at 2.5 m overall. The low-pitch roof that looks tidiest on a modern garage is the one with the least headroom to spare. A dual pitch may reach 4 m, but the eaves still stop at 2.5 m.
- Near the house, 1.5 m. Nothing within 2 m of the house may be taller than that, so a garage built tight to the gable either moves out or needs an application.
- The side of the house counts. A building beside the house must not be nearer a highway than the house is, or within 5 m of it, whichever is nearer. On a corner plot that rules out the obvious spot.
The rest will be familiar: single storey, not in front of the house, no more than 50% of the garden covered with the other outbuildings, and no more than 2.5 m high within 2 m of a boundary. There is no notice to give. A building meets every limit, or it needs an application.
A building in a garden is not agricultural development, whatever the frame is made of. It sits under Part 1 of the General Permitted Development Order rather than Part 6, and in Wales under the householder rules the Welsh Government rewrote in 2013.
The first difference is procedural. Farm buildings have a notification step: you tell the council and it has 28 days. Class E has nothing of the sort. Either the building meets every limit below, in which case no application is needed at all, or it fails one and needs full planning permission.
What Class E permits is a building in the garden of a house, required for a purpose incidental to enjoying that house. Storing the car, a workshop for your own use, garden machinery, a home gym — incidental. Running a business from it is not, and neither is anything that amounts to separate living accommodation.
The limits. It must be single storey, and not in front of the principal elevation of the house. Beside the house, it may not be nearer a highway than the house is, or within 5 metres of one. All outbuildings together, leaving the original house out of it, may cover no more than 50% of the garden. Not in the curtilage of a listed building, and not at a flat or maisonette.
Height is where a steel frame runs aground. The eaves cannot exceed 2.5 metres at any point along their length, wherever the building sits. Overall height can reach 4 metres with a dual-pitched or hipped roof, 3 metres with a single pitch and 2.5 metres flat. Within 2 metres of a boundary nothing may exceed 2.5 metres, and within 2 metres of the house nothing may exceed 1.5 metres.
Height is measured from the ground immediately next to the building, and where that ground is not level, from the highest part of it. On a sloping plot the cut end of the platform sets the measurement, so the fall across the site eats the headroom you thought you had. It is the one place on this site where the groundworks decision and the planning decision are the same decision.
Protected land changes the answer. In a National Park, an Area of Outstanding Natural Beauty, a conservation area or a World Heritage Site, buildings more than 20 metres from the house are limited to 10 square metres in total — a garden shed — and nothing may go between the side of the house and the side boundary. A steel building at the bottom of the paddock is then a planning application.
A summary, not planning advice. The legislation is Part 1 of Schedule 2 to the 1995 Order as substituted for Wales in 2013, checked on 23 September 2026 against the Order and the Welsh Government's outbuildings guidance. An article 4 direction or a condition on an earlier permission can remove these rights on a particular property, so confirm your own position with your council.
In the Parks and the AONBs, a shed, not a garage
Much of this site's patch is protected landscape: the Bannau Brycheiniog and Pembrokeshire Coast National Parks, the Gower and the Wye Valley, and every conservation area. There, garden buildings more than 20 m from the house may cover 10 m² in total, and nothing may go between the side of the house and the side boundary. A 6 × 6 m double garage is 36 m², so in those places it is an application almost wherever it goes. In a National Park the application goes to the Park authority, not the county council.
10 m²
The most garden building allowed without an application more than 20 m from the house in a National Park, an AONB, a conservation area or a World Heritage Site in Wales.
For the house, or for a trade
The question the council asks first is what the building is for. A garage or workshop for the house — the cars, your own projects, the mower, a home gym — that misses a limit goes in as a householder application, £283 wherever you are in Wales.
A workshop a business runs from is a different application altogether, charged by floor area. A 9 × 12 m unit, 108 m², is £1,170. It is also over 100 m², so its drainage needs the council's SuDS Approval Body as well: £420 on a site plan of that size, with 7 weeks for a decision. A big domestic garage over 100 m² needs the SAB too, even when it needs no planning application at all.
Building Regulations, and why the steel matters
A detached single-storey building with nobody sleeping in it is exempt from Building Regulations in Wales under 15 m², and up to 30 m² if it is at least 1 m from every boundary or built mostly of materials that do not burn. A steel frame clad in steel is normally accepted as the second, which lets a garage sit close to the fence without losing the exemption. Confirm it with the council's building control before relying on it.
The exemption ends past 30 m², and a 6 × 6 m double garage is already 36 m². A room anyone sleeps in ends it at any size.
The floor
A 6 × 6 m garage at 150 mm is 6.5 m³ of concrete and 12.1 t of Type 1: one ready-mix delivery. A car lift, heavy machinery or anything that drives in heavier than a car changes that, and the calculator below shows by how much.
Work out the base for your garage or workshop
Set for a domestic garage. Change the size to your own, and put the slab up to 200 mm if a motorhome, horsebox or tractor will stand on it.
What this does not work out: the pad foundations
The concrete pads the stanchions sit on are sized by a structural engineer, not by a formula. They change with the span, the eaves height, the wind loading on your particular site and what the ground will bear. Anyone quoting you a pad size without a design has guessed it.
Want this priced properly?
Send us the job and we'll get you engineered drawings and a quote for the frame — with the pad sizes this tool can't work out. The figures above go with your enquiry, so you don't have to type them again.
Every enquiry gets a reply the same day, and your figures go with it. The building itself is designed and priced by South West Steel Buildings, our building partner, so your details go to them too, and they will be in touch. How we handle your details.
Common questions
- Do I need planning permission for a steel framed garage or workshop at home in Wales?
- Sometimes not, but the limits are tighter than most people expect and a steel frame meets one of them quickly. In Wales, Class E of Part 1 of the 1995 Order permits a building in the garden of a house if it is for a purpose incidental to enjoying the house, is single storey, is not in front of the house, and — with other outbuildings — covers no more than 50% of the garden. Its eaves may be no higher than 2.5 metres. Overall it may be 4 metres with a dual-pitched or hipped roof, 3 metres with a single pitch and 2.5 metres flat, and no more than 2.5 metres within 2 metres of a boundary. There is no notification step: either it meets every limit, or it needs full planning permission.
- How tall can a permitted development outbuilding be in Wales?
- The eaves cannot exceed 2.5 metres at any point along their length, wherever the building sits. Overall height can reach 4 metres with a dual-pitched or hipped roof, 3 metres with a single pitch or other roof, or 2.5 metres flat — but within 2 metres of a boundary nothing may be higher than 2.5 metres, and within 2 metres of the house nothing may be higher than 1.5 metres. Height is measured from the ground next to the building, and from the highest part where the ground is not level, so a sloping plot gives less usable height, not more. A 2.5 metre eaves leaves a door opening of roughly 2.1 to 2.3 metres once the frame and header are allowed for: enough for cars, a workshop and storage, and not for a motorhome, horsebox or tractor.
- How much does a planning application for a garage cost in Wales?
- If the garage or workshop is for the house — the car, your own tools, a gym — and it misses a garden-building limit, it is a householder application at £283. If it is for a business, it is charged by floor area on the scale for buildings that are not agricultural: a 9 by 12 metre workshop is £1,170. The fees are set nationally, so every Welsh council charges the same.
- Can I run a business from a steel workshop at home?
- Not under the garden-building rules. They cover a building for a purpose incidental to enjoying the house, and a trade is not that. The steel can be identical; what changes is what happens inside it, and with it the application and the fee. Say at the start if it is for work, because the planning position is far weaker once a neighbour has complained about vans and noise.
- What floor does a steel garage need?
- The calculator starts a domestic garage at 150 mm with mesh, the lightest floor on this site: a car spreads its weight over four tyres. A two-post or four-post lift, a pillar drill or a press puts the load through a few small feet and wants a thickened pad designed under it. Anything heavy that drives in — a motorhome, a horsebox, a tractor — wants the 200 mm floor a farm building gets.
- Is it different in a National Park, an AONB or a conservation area?
- Yes, and sharply. In a National Park, an Area of Outstanding Natural Beauty, a conservation area or a World Heritage Site, outbuildings more than 20 metres from the house may cover no more than 10 square metres in total — a shed, not a garage — and nothing may be built between the side of the house and the side boundary. In South Wales that takes in the Bannau Brycheiniog and Pembrokeshire Coast National Parks, the Gower and Wye Valley AONBs, and every conservation area, so check your own plot before drawing anything.
- Does a domestic garage or workshop need Building Regulations approval in Wales?
- Often not. A detached single-storey building with no sleeping accommodation is exempt if its floor area is under 15 square metres, or up to 30 square metres if it is at least 1 metre from every boundary or built substantially of non-combustible materials. A steel frame clad in steel is usually accepted as the second, which takes the boundary distance out of the question — but confirm it with your council's building control before you rely on it. Sleeping accommodation of any kind ends the exemption, and so does going over 30 square metres: a proper double garage at around 6 by 6 metres is already past it.
Garages and workshops we can price






Other buildings we cover
Same approach on each: what the building is, how it gets sized, where you stand on planning, and what the base underneath it comes to.
Machinery stores
A dry, clear-span shed for the tractor, the quad, the feed and the fertiliser, on a floor that takes a turning trailer. Priced above the ground and below it.
Grain stores
Retaining walls designed for the depth of grain, a slab for the loader, and a roof that does not drip on the heap.
Livestock buildings
Cattle and sheep housing for a Welsh winter: air in, muck out, water kept apart. With the slurry rules, the grants that do and do not apply, and the 400 metre trap.
Farm workshops
Space to mend a machine with room all round it, height for a hoist, and a floor built for axle stands. Plus the planning line between your kit and a repair business.
Hay barns
Bale storage for a wet summer: where to site it, what the fire services say about stacking, and the planning condition that follows a store near a house.
General purpose buildings
Bales one year, ewes the next, the tractor every winter. How to size and floor a shed whose job keeps changing, and the rules that change with it.
Stables and arenas
Stable blocks and arena buildings in Wales: a full planning application, a welfare code that sets the doors and headroom, and no farm grant.
Industrial units
Warehouses, trade units and workshops in Wales: the use classes Wales kept, the fees and drainage approval, the rates bill and the finance.